欧美成 人版在线

  • <th id="9gnkg"><option id="9gnkg"></option></th>
  • <center id="9gnkg"></center><th id="9gnkg"><sup id="9gnkg"></sup></th>

    <object id="9gnkg"><nobr id="9gnkg"></nobr></object>
    <th id="9gnkg"><sup id="9gnkg"></sup></th>
  • <del id="9gnkg"><small id="9gnkg"><samp id="9gnkg"></samp></small></del>
    1. <code id="9gnkg"><em id="9gnkg"><track id="9gnkg"></track></em></code>
      <th id="9gnkg"></th>

      MINING PROJECTS

      Mining Projects

      The depth of experience, knowledge, skills and equipment within the Meales Concrete Pumping operation ensures our capability and capacity to perform a wide range of operationally complex projects. In addition to the work we perform on LNG and Energy projects, we are continually engaged in a variety of other mining projects. Please see below a selection of projects we have completed or are currently working on.

      For Major Projects and Dry Hire of Mobile & High Rise Equipment and Solutions, please contact us us or send us an online enquiry.

      ABBOT POINT QLD

      Contractor: John Holland

      Duration: 2004 to Current

      Situated about 25km north of Bowen, Abbott Point is Australia's most northerly coal port. With current expansions underway.

      John Holland awarded X25 and BMD awarded X50 the forecasted output of this terminal will be over 100 million tonnes per annum. This involves the upgrade rail in- loading facility, coal handling and stockpile areas, jetty and conveyor systems.


      All concrete on this project will be required to be pumped.

      lajv

      YARWUN ALUMINA REFINERY STAGE 2 QLD

      Contractor: Golding and Betchel

      Duration: 2008 to Current

      Yarwun 2 Alumina Refinery, base 10 km from Gladstone is is currently undergoing it's Stage 2 expansion. Bechtel Constructions and Golding Contractors Joint Venture are the major contractors responsible for doubling of the size of this processing plant.

      With earthworks completed early 2008 civil and structural works are in full swing with more than 1500 workers involved in this project. With more than 70,000 cubic meters of concrete to be placed in this project, this requires one full time pump onsite with the support of any where up to 4 other pumps assisting with the daily placement of concrete. February 2009 will also see a separate placing boom require for the 45m high concrete silo.

      This project is expected to be fully completed by early 2010

      Golding Logo
      betchellogo

      LIHIR GOLD MINE PNG

      Contractor: Lihir Gold Corporation

      Duration: 2006 – 2007

      Lihir Gold is one of the World’s largest Gold Mines and processing facilities situated on the island of Lihir, 900 km northeast of Port Moresby, Papua New Guinea.

      Major expansions took place to the processing plant during 2006 and 2007. This required the placement of approximately 15,000 Cubic Metres of concrete to tunnels and various structures to support the new plant

      leighton-logo

      today for a quote!

      CONTACT US

      Phone VolumeFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)
      EnvelopeFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)

      FOLLOW US

      QUICK LINKS

      CONCRETE PUMPS

      CONCRETE PUMPING SPECIFICATIONS

      PROJECTS

      欧美成 人版在线
    2. <th id="9gnkg"><option id="9gnkg"></option></th>
    3. <center id="9gnkg"></center><th id="9gnkg"><sup id="9gnkg"></sup></th>

      <object id="9gnkg"><nobr id="9gnkg"></nobr></object>
      <th id="9gnkg"><sup id="9gnkg"></sup></th>
    4. <del id="9gnkg"><small id="9gnkg"><samp id="9gnkg"></samp></small></del>
      1. <code id="9gnkg"><em id="9gnkg"><track id="9gnkg"></track></em></code>
        <th id="9gnkg"></th>

        ? 2020 Meales Concrete Pumping

        Fill out the form below and we will be in contact with you shortly. Or call 1300 632 537.